WESTFIELD — The Planning Board approved a site plan and special permit revision for plans to expand the Lowe’s Flatbed Distribution Center at a Dec. 5 meeting.
In a letter sent to the board, Brady Berry, associate director of engineering firm Atwell LLC, wrote that Lowe’s would like to install a canopy and tarping shed at the 180 Servistar Industrial Way facility. The canopy will be 100 by 390 feet and will be installed on the east side of the original building.